1 | Function | Collecting metal or slag from the tundish in the event of diversion from the outlet of the tundish nozzles (via. launders mounted on the tundish car) or overflow of metal from the tundish spout. |
2 | Location | Behind the moulds |
3 | Design / Construction | Slag box body in C.I.Casting. Construction will be an integral part of steel structure and will be provided with an overflow spout point into the emergency ladle. |
4 | Excluding | Refractory lining |